Full-body mapping. Ultimate precision
Equipped with an intelligent retractable handle, BodyFit delivers independent measurements for your arms, legs, torso, and abdomen. Validated at 99% correlation with DEXA, it helps you track your progress with professional-grade accuracy at every weigh-in.
What Withings users have achieved
Individual results vary; outcomes depend on diet, activity, baseline composition, and overall health.
- 77% lost 2kg of fat in 90 days - Based on 120k Body Scan users over 90 days
- 94% gained more than 1% in muscle mass - Based on 66,875 Body Scan users who weighed in daily over 6 months
- 53% lost fat despite the scale not moving - Average fat loss of 2.25 lbs among 115k Body Scan users over a 90-day period
- 750m+ body composition measurements - Based on Withings lifetime userbase
The technology - Precision, by design
99% Dexa Correlation
The same accuracy standard used in clinical settings. Not an estimate.
Whole body analysis
Arms, legs, and torso measured separately. Because where matters as much as how much.
20-second scan
Step on. Hold the handle. Done.
20+ Patents
Fifteen years of medical engineering in your bathroom.
Built for GLP-1 Users
GLP-1s can silently strip muscle. BodyFit tracks lean mass across your whole body so you can act before it's too late.
Automatic syncing & easy setup
Up and running in minutes. Your scale syncs automatically, no phone needed during use.
Beyond your weight
Not all weight loss is created equal. Losing muscle is a setback; losing fat is progress. BodyFit breaks down every weigh-in so you can ensure you’re losing the right weight, not just any weight.
Weight and Body Composition
- Reach your weight goal - Track your progress in 3D, zone by zone
- Target fat with precision - Reduce body fat exactly where you want to
- Protect your muscle mass - Preserve every hard-earned muscle gain
- Explore your full body composition in detail - Find all your essential biomarkers, in one place
Advanced metabolic tracking
- Measure your visceral fat - Detect the hidden fat that impacts your health the most
- Optimise your daily calorie needs - Adjust your nutrition based on your actual BMR
- Go beyond BMI & identify your body profile - See your body composition mapped out and know exactly what to work on
Complete cardiovascular assessment
- Assess your vascular health - Measure arterial stiffness and track the true age of your arteries
- Track your resting heart rate - A lower resting heart rate means a stronger, more efficient heart. Watch it improve as you build a more active lifestyle with BodyFit
Body Intelligence and Progress
- Get personalised insights - Receive recommendations tailored to your body and your goals
- Adapt your plan to your unique physiology - Activate modes designed for athletes, pregnancy and more
- Stay on track, every step of the way - Powered by BodyPath, an all-new Withings feature, follow your progress over time and keep moving toward your goal
Uncompromising design
BodyFit packs ultra-resistant ITO glass, a high-resolution color display, and a smart retractable handle - compact, light, and built without compromise.
- Dynamic color display - LCD Screen 3.4", 320 x 240 px
- Precision ITO platform - High precision, For every foot size, 300x300x30 mm
- Smart retractable handle - 4 embedded electrodes
- Reinforced aluminum chassis - Robustness and durability
- Light & compact - Designed to fit all bathroom floors
Your body goal, always in sight
BodyPath is a personalised weight management companion that turns a simple weight goal into a tailored body composition journey. It automatically tracks your calorie intake versus burn and shows how it impacts your goal completion date.
Log your meals & workouts - or skip it entirely
Weekly calorie balance insights, no strict logging required. Flexible tracking that fits your lifestyle and lets you take control of your weight journey.
Track progress & predict when you reach the finish line!
BodyPath continuously adapts to keep you moving toward lasting results. Track your trajectory and see when you’re projected to hit your goal.
Weight
- Four weight sensors
- Precise weight measurements (50g)
Body Composition
- Multi-Frequency Bioimpedance Spectroscopy
- Units: body fat %, total body water %, muscle mass kg or lb, bone mass kg or lb, Visceral Fat Index, Basal Metabolic Rate
Multi-user friendly
- Automatically recognises and tracks up to 8 users
- Features tailored modes, including Athlete and Baby. Pregnancy and Eyes Closed Mode will be enabled shortly
Wireless Sync
- WiFi 802.11 b/g/n, compatible with WEP/WPA/WPA2-personal networks
- Bluetooth connectivity (Bluetooth Smart Ready)
Four weight sensors
- Weighing range: 5 -> 200kg (9 -> 440lb)
- 50g (0.1lb) graduation
- Units: kg, lb, st lb
Patented body position detector
- Highly-accurate weighing via Position ControlTM technology
Storage and memory
- Free and unlimited storage of weight data
- Stores up to 16 readings if scale cannot sync wirelessly
Power supply
- Rechargeable Li-ion battery
- Average battery life: up to 1 year per charge
Withings App
- Available on: App Store (iOS), Google Play Store (Android)
- Apple Health, Google Health Connect & Google Fit compatible
- Withings App Web dashboard
- iPhone, iPad, or iPod touch (iOS 18 and higher), or Android device (OS 12 and higher)
- Cannot be set up from a computer
Key Features:
- Complete segmental body composition
- Visceral fat
- Fat & muscle mass distribution in 6 body zones
Box Contains:
- Bodyfit
- USB-C Cable
- Quick Installation Guide